Home / Models / Load without injury: weeks → risk → build-up plan
Load without injury: weeks → risk → build-up plan
Whether mileage or volume rose too fast (joints, ligaments and tendons adapt more slowly than muscles), what volume is safe next week and how many weeks it takes to reach the goal.
What to enter (example)
- Volume three weeks ago — 20 km
- Volume two weeks ago — 22 km
- Volume last week — 24 km
- Volume this week — 34 km
- Target weekly volume — 50 km
- Weekly increase — 10 %
- Every which week is a deload — 4
- Safe acute to chronic limit — 1.3
Layer 1 · Four weeks
Layer 2 · Risk
- Acute to chronic workload
Layer 3 · Plan
- Safe volume next week, km
- Weeks to the target, weeks
Example result
| Risk · Acute to chronic workload | 1.36 |
| Risk · Zone: 0 — underload, 1 — safe (0.8–1.3), 2 — caution (1.3–1.5), 3 — injury risk rises (above 1.5) | 2 |
| Plan · Safe volume next week | 32.5 km |
| Plan · Total weeks to the target | 6 |
Example numbers come from the same engine as the app and are checked against an independent calculation. Replace them with yours — in Numo.
What the model leaves out
- the 1.3 limit is Gabbett’s (2016) guide, which is criticised: a planning aid, not an injury forecast
- pain in a joint or tendon is a reason to cut the load and see a doctor