Newsvendor
Perishable goods, event tickets, a seasonal batch — anything you can't restock or fix later.
Or ask in your own words (needs an AI key)
What you need
- loss from being one unit short
- loss from one leftover unit
- average demand
- spread of demand
What it calculates
- the ideal chance of fully meeting demand, based on the trade-off between the two costs (%), %
- the total quantity to order (units), pcs
- the same target service level — the odds you won't run out of stock (%), %
- how many extra units to add above average demand as a buffer (units), pcs
Examples
Shortage costs 30, excess 12; demand 200 ± 40
| the ideal chance of fully meeting demand, based on the trade-off between the two costs (%) | 71.4286 % |
| the total quantity to order (units) | 222.638 pcs |
| the same target service level — the odds you won't run out of stock (%) | 71.4286 % |
| how many extra units to add above average demand as a buffer (units) | 22.638 pcs |
Shortage costs 5, excess 15; demand 1,000 ± 150
| the ideal chance of fully meeting demand, based on the trade-off between the two costs (%) | 25 % |
| the total quantity to order (units) | 898.827 pcs |
| how many extra units to add above average demand as a buffer (units) | -101.173 pcs |
Example numbers are checked against an independent calculation. The AI in Numo does not compute: it only parses your question; a deterministic engine does the maths.
Careful
Assumes demand is normally distributed, which is a poor fit for rare, high-value items.
Typical mistakes
- Confusing the shortage cost with the selling price: it is lost profit.
- Forgetting the salvage value of unsold units.
More in this family «Operations»
- Capacity, utilisation and staffing
- Product yield: how much to buy to get the usable weight you need
- Driving hours: how long you can still drive before a break, today and this week
- Overall equipment effectiveness (OEE)
- Vehicle loading: how many boxes fit by volume and weight
- Economic order quantity
- Baker’s percentages: water, salt and yeast from the flour weight
- Safety stock
- Takt time and number of stations